How we work

A clear process, from the first drawing review to delivery on site, so your project moves forward without surprises.

  1. Technical consultation

    We review drawings, door schedules and unit types, and recommend models, configurations and hardware for each space.

    [PENDIENTE: tiempo de respuesta de la cotización]

  2. Samples

    We send finish samples or a mock-up door for approval by the owner or the project inspector.

    [PENDIENTE: tiempo de entrega de muestras]

  3. Production

    Once the proposal is approved, we schedule production at our plant in the Barranquilla Free Trade Zone.

    [PENDIENTE: tiempos de producción por volumen]

  4. Shipping from the Free Trade Zone

    We ship to the job site on the agreed schedule, domestically or for export.

    [PENDIENTE: tiempos de despacho nacional y de exportación]

  5. Installation or support

    We support installation with technical recommendations and handle any warranty request.

    [PENDIENTE: confirmar alcance de instalación]

Job-site recommendations

  • Store doors under cover, away from direct sun, rain, dust and moisture.
  • Stack doors flat, in piles of equal size, 15 cm (6 in) off the floor.
  • Do not install doors on damp walls or in buildings where wet trades are still in progress.
  • Install the door immediately after unpacking, and the lockset right after hanging it.
  • Installation by a qualified technician is recommended.

Source: use recommendations from the Mademeco warranty letter.

Have a project in the works?

Send us your drawings or door schedule and we will prepare a proposal with models, configurations and hardware.

Chat with us on WhatsApp